3D Laser Scanning for Existing Buildings

We capture existing buildings with terrestrial laser scanners and drones and hand back a registered, georeferenced point cloud — the measurable foundation for BIM modelling, as-built drawings and building documentation.

Why scan

Replace the tape measure with millions of measured points.

A renovation project fails at the point where the drawings stop matching the building. Hand measurement records what somebody thought to measure; a 3D laser scan records everything within line of sight, at a density no manual survey reaches.

Each scan position captures millions of points with their position and reflectivity. Registered together they form one point cloud — a dimensionally accurate digital copy of the building as it stands today, rather than as it was drawn.

Standard tolerance is ±20 mm between the delivered data and the building. Scans are georeferenced to the Swiss reference frame CH1903+ / LV95, so the data sits correctly against site plans, official survey data and neighbouring projects.

At a glance

Method
Terrestrial laser scanning · drone survey · photogrammetry
Tolerance
±20 mm unless otherwise specified
Reference frame
CH1903+ / LV95, or your project frame
Point cloud formats
E57 · RCP · RCS
Typical duration
1–3 days on site for a single building
You provide
Site access and one contact person

How a scan runs

From site visit to registered point cloud.

The same four steps every time, so you know what is happening on your site and what arrives at the end of it.

  1. Step 1

    Survey planning

    Scope, target tolerance and access are agreed before anyone travels. Scan positions are planned so the building stays in use and no area is left in shadow.

  2. Step 2

    On-site capture

    Terrestrial laser scanning station by station, drone flight for roofs, facades and surroundings, and control targets wherever the project needs verified accuracy.

  3. Step 3

    Registration & cleaning

    Individual scans are registered into one coordinate system, checked against the control measurements, and cleaned of people, vehicles and scatter.

  4. Step 4

    Delivery

    The registered cloud in your format, 360° panoramas for visual reference, and a short report stating coverage, method and achieved tolerance.

Deliverables

What leaves our office.

  • .E57

    Registered point cloud, open format

  • .RCP / .RCS

    Autodesk ReCap project for Revit

  • .JPG

    360° panoramic imagery per scan position

  • LV95

    Georeferenced data in CH1903+ / LV95

  • .PDF

    Scan report and coverage plan

  • .RVT / .PLN

    Modelling-ready input for BIM production

Applications

Where a scan pays for itself.

Anywhere a wrong dimension becomes a change order, capture is cheaper than the correction.

  • U-01

    Renovation & refurbishment

    Establish the actual condition before design starts, so demolition and new build are planned against the building rather than against an assumption.

  • U-02

    Architecture & design

    Existing-condition data you can plan on directly — sections, heights and levels taken from measurement, not from a drawing set of unknown vintage.

  • U-03

    Scan-to-BIM projects

    A clean, registered cloud is the input a BIM model is only as good as. Ours is produced to be modelled from, not just to be looked at.

  • U-04

    Building documentation

    A durable digital record of the building as it stands — for property files, insurance, handover and facility management.

  • U-05

    Volume & area verification

    Areas and volumes derived from measured geometry, for area statements, rental documentation and feasibility work.

  • U-06

    Site & surroundings

    Drone survey of roofs, facades and terrain where a tripod cannot reach, tied into the same coordinate frame as the interior scans.

Specification

The numbers, in writing.

DATASHEET / SC-SVC-01

±20 MM

Capture technology
Terrestrial laser scanning (LiDAR) · UAV / drone survey · photogrammetry
Accuracy tolerance
±20 mm unless otherwise specified, verified against control targets
Georeferencing
CH1903+ / LV95 — or the project's own coordinate frame
Processing
Leica Cyclone · Autodesk ReCap — registration, validation, noise cleaning
Output formats
E57 · RCP · RCS · 360° panoramas (JPG) · scan report (PDF)
Occupied buildings
Yes — non-contact, section by section, planned around daily use
Data transfer
Secure exchange; multi-gigabyte datasets are standard

FAQ

3D laser scanning, answered.

Our standard delivered tolerance is ±20 mm between the point cloud and the building. The scanner itself measures far tighter than that; the figure we publish is the one that survives registration across every scan position, which is the number that matters for planning. Tighter tolerances for individual elements are possible and are priced per project.

Next step

Tell us about the building.

Area, target LOD and a rough timeline are enough for a scoped quote with rates, deliverables and dates.